Burleson Septic Cleaning
Burleson, TX
- Septic pumping
- Aerobic maintenance contracts
- Inspections for home sales
- Septic repair
- Installation and permits
We show each company's state license status. Checks are in progress.
17 septic providers serving Parker County, with each one's TCEQ license status.
17 companies
Burleson, TX
Serves Denton, Montague, Parker, Tarrant, Wise counties
Serves Hood, Parker counties
Joshua, TX
Aledo, TX
Weatherford, TX
Cleburne, TX
Roanoke, TX
Millsap, TX
Springtown, TX
State license
License check pending
Weatherford, TX
Serves Palo Pinto, Parker, Tarrant counties
Parker County has the most rural housing on our list: 36,224 of its 57,427 housing units were rural in the 2020 Census, a rough proxy for septic use rather than a count. It also builds the most systems. TCEQ's 2025 report shows Parker County authorized 1,266 new on-site systems, plus smaller numbers in Weatherford, Reno, Willow Park and Hudson Oaks, which run their own programs. Weatherford, Aledo and Springtown publish municipal sewer service.
NRCS soil data for Parker County lists Windthorst, Aledo, Duffau, Venus and Bolar as its largest soil components and rates about 64% of the acreage "very limited" for septic tank absorption fields, the lowest share among our launch counties. That still leaves about two-thirds of the county where a site evaluation is likely to point away from a conventional drain field, and Texas A&M AgriLife notes that clay soils accept only non-standard drain fields.
Of the 1,266 systems Parker County authorized in 2025, TCEQ counts 1,101 as surface irrigation, which state rules pair with secondary treatment such as an aerobic unit. The county's 2007 order requires aerobic systems to have a maintenance contract and says there shall be no homeowner maintenance unless the owner is certified by the manufacturer. The county's affidavit form also mentions maintaining the system personally after two years, so confirm the current rule with the Permitting Department.
The Parker County Permitting Department is the TCEQ authorized agent for unincorporated Parker County. The 2007 order requires a permit for every OSSF and at least one acre per lot regardless of water source. Site evaluations must be done by a Sanitarian, Engineer or Designated Representative with a Site Evaluator license; aerobic designs must come from a Sanitarian or Engineer. The county approves or denies complete applications within five days, and no part of a system may be installed before approval.
One short form. Free, no obligation. A septic provider in your county gets in touch.