Parker County septic permit guide
The Parker County Permitting Department issues septic permits in unincorporated Parker County. It publishes a flat $480 permit fee and approves complete applications within five days.
By The Septic Connection · Updated November 21, 2026
Reviewer: pending. This guide will be reviewed by a licensed installer before we name one.
Who issues septic permits in Parker County
Parker County is a TCEQ authorized agent for on-site sewage facilities (OSSFs) in unincorporated Parker County. Its order was adopted August 27, 2007 and approved by TCEQ on October 5, 2007, and it also covers any city with an interlocal agreement with the county. Parker County authorized 1,266 new systems in 2025, the most of any county on our list, according to TCEQ.
Parker County rules that go beyond the state
- Every OSSF must be permitted, so the state's 10-acre exemption does not apply.
- Minimum lot size is one acre regardless of water source.
- Site evaluations may be done only by a Professional Engineer, Professional Sanitarian or Designated Representative holding a Site Evaluator license.
- Conventional systems may be designed by a licensed installer, sanitarian or engineer; aerobic systems must be designed by a sanitarian or engineer.
Steps to a permit
- Site evaluation by a licensed Site Evaluator or Professional Engineer, with two soil borings or pits (30 TAC §285.30).
- Planning materials: the system design and site drawing (30 TAC §285.5).
- Application with planning materials, site evaluation and fee; aerobic systems also need an affidavit recorded in the county deed records (30 TAC §285.3(b)).
- Authorization to construct, approved or denied within 30 days and valid for one year.
- Inspection before the system is covered; the installer gives five working days' notice.
- Notice of approval (license to operate), the final part of the permit. Aerobic systems need the signed two-year service policy on file first (30 TAC §285.7).
The county's permitting requirements list what to submit: the state-approved application, the site and soil evaluation, the design, and the plat or a survey with legal description and lot size. Aerobic systems also need a maintenance service contract signed by both parties and a certified copy of the notarized Affidavit to the Public after it is filed with the County Clerk. Incomplete applications are not accepted. The county approves or denies within five days; resolving problems can take up to 30 days, and a denial comes in writing. No physical parts of a system may be installed until approval. The application states that a permit to operate is granted after successful inspection of the installed system.
Permit fee
The county's permitting requirements list a permit fee of $480.00 for both conventional and aerobic systems, payable by cash, check, money order, card or e-check. We did not find a separate published fee for repairs or commercial systems.
Aerobic systems and maintenance contracts
Parker County's 2007 order requires aerobic systems to have a maintenance contract with a TCEQ-registered company and states there shall be no homeowner or property owner maintenance of aerobic systems unless the owner is certified by the manufacturer, or is a licensed installer certified by the manufacturer. The county's affidavit form, however, repeats the state wording that after the two-year service policy the owner shall either obtain a maintenance contract within 30 days or maintain the system personally. Ask the Permitting Department which rule it applies before you cancel a contract.
You can check a maintenance provider's or installer's license in TCEQ's license search.
Office contact
- Office: Parker County Permitting Department
- Address: 1114 Santa Fe Drive, Weatherford, TX 76086
- Phone: (817) 598-6175
- Hours: Monday to Friday, 7 a.m. to 4 p.m.
What changes inside city limits
Several cities in Parker County are their own TCEQ authorized agents and permit OSSFs inside their limits: Weatherford, Willow Park, Hudson Oaks, Reno and Mineral Wells for its Parker County portion. Weatherford's FY26 utility fee schedule lists septic systems (OSSF) at $500 new and $250 repair. Aledo and Springtown are not on TCEQ's 2025 authorized agent list; both publish municipal sewer service, so check with the city about connecting before designing a septic system, and with the county about permits outside the sewer area.
Frequently asked questions
Do I need a permit to repair my septic system?
TCEQ says replacing a tank or repairing or replacing a drain field requires a permit. Emergency repairs such as replacing a lid or an inlet or outlet device can start right away, but must be reported to the permitting authority in writing within 72 hours (30 TAC §285.35).
Related guides
Sources
- Parker County Permitting Department
- Parker County permitting requirements
- Parker County OSSF Order (2007)
- Parker County permit application
- City of Weatherford utility fee schedule FY26
- 30 TAC Chapter 285, On-Site Sewage Facilities (Texas Secretary of State)
- RG-472, On-Site Sewage Facility Rules Compilation (TCEQ)
- Types of Systems Installed by Time Period, 2025 (TCEQ)
- Maintenance of On-Site Sewage Facilities (TCEQ)