Texas septic regulations and permits
Texas sets statewide minimum rules for septic systems, and counties enforce them, often with stricter rules of their own. This guide explains who does what, when you need a permit, and which state licenses each job requires.
By The Septic Connection · Updated November 21, 2026
Reviewer: pending. This guide will be reviewed by a licensed installer before we name one.
The rulebook
Texas law calls a septic system an on-site sewage facility (OSSF). Three sets of rules apply:
- Texas Health and Safety Code Chapter 366, the state law behind the OSSF program.
- 30 TAC Chapter 285, TCEQ's rules for permitting, design, construction, maintenance and enforcement.
- 30 TAC Chapter 30, Subchapter G, which covers OSSF licenses and registrations.
Pumping and hauling septage fall under a separate chapter, 30 TAC Chapter 312.
Who issues permits: authorized agents
TCEQ is rarely the permitting authority. Most permits come from a local government (a county, city, river authority or health district) that TCEQ has approved as an authorized agent. Where no local program exists, the TCEQ regional office handles permits. Authorized agents may adopt rules stricter than the state minimums, and each of their staff reviewers, called designated representatives, must hold a TCEQ license.
Ellis, Kaufman, Parker, Hunt and Rockwall counties each run their own OSSF permit programs; for Johnson County, use TCEQ's county search to confirm the office. Two examples of stricter local rules:
- Ellis County (order approved by TCEQ in April 2024) requires a permit, fee and inspection for any construction, alteration, extension or repair, no matter how large the tract. Every design must come from a registered sanitarian or professional engineer, and homeowners may not install a system unless they hold an installer license.
- Kaufman County (order approved February 2022) requires a permit regardless of acreage. Site evaluations and designs must be done by an engineer or sanitarian. Every aerobic system needs a maintenance contract, with inspections every four months.
Each county has its own permit guide with steps, contacts and local rules, at /guides/county-name-county-septic-permit/. Start with the Ellis County septic permit guide.
Who needs a permit
Under 30 TAC §285.3, you need a permit and an approved plan to construct, alter, repair, extend or operate a septic system. The exceptions under state rules:
- Grandfathered systems. Systems installed before September 1, 1989 (or before an earlier local program began) that haven't been altered, aren't failing and aren't causing a nuisance.
- The 10-acre rule. A single-family home that is the only dwelling on a tract of 10 acres or more, with every part of the system at least 100 feet from the property line, effluent kept on the property, and no nuisance or groundwater pollution. TCEQ says these systems still need a site evaluation and must meet all construction standards. Counties can override this; Ellis and Kaufman do.
- Emergency repairs listed in 30 TAC §285.35, such as replacing tank lids, inlet or outlet devices, risers and caps, or disinfection devices. These need no permit, but they must be reported to the permitting authority in writing within 72 hours of starting.
Cesspools, seepage pits and boreholes are prohibited and must be closed.
How a permit moves
- Site evaluation. A TCEQ-licensed site evaluator or professional engineer surveys the lot, analyzes the soil where the system will go, and notes nearby features that set separation distances.
- Application and planning materials. These are submitted to the permitting authority with the fee. Complex systems need a professional design. For systems that need ongoing maintenance, an affidavit must be recorded in the county deed records first.
- Decision within 30 days. The authority approves and issues an authorization to construct, or explains a denial in writing. The authorization is valid for one year.
- Construction inspection. The installer must notify the authority at least five working days before the system is ready. A failed system can't be used until it passes.
- Notice of approval within seven calendar days of passing.
Aerobic systems also need an initial two-year service policy before they are approved for use (30 TAC §285.7).
The license types
Anyone paid to work on any part of a septic system must hold the right TCEQ license or registration. What each one allows, per TCEQ:
| License or registration | What it allows |
|---|---|
| Installer I | Standard systems: septic tanks, absorptive drainfields, unlined evapotranspiration drainfields, leaching chambers, gravel-less pipe and pumped effluent drainfields |
| Installer II | All types of systems, including aerobic units, spray, drip and low-pressure dosing |
| Apprentice (registration) | Work on site for a licensed installer under constant, direct supervision; may not act as or advertise as an installer |
| Site Evaluator | Preconstruction site and soil evaluations (also open to professional engineers without this license) |
| Designated Representative | Plan review, inspections and complaint investigations, only while employed by an authorized agent |
| Maintenance Provider | Servicing and maintaining aerobic systems; responsible for the contract and signs all maintenance reports |
| Maintenance Technician (registration) | Maintenance work only under a licensed maintenance provider's direct supervision; may not advertise as a provider |
Licenses run for three years. Except for apprentices and maintenance technicians, renewal needs 24 hours of continuing education.
Homeowner exceptions. State rules let the owner of a single-family home install or repair a system on their own property, as long as it isn't being developed for sale or lease. The site evaluation must still come from a licensed site evaluator or engineer, and anyone the owner pays must be licensed. After the two-year policy ends, an owner may also maintain their own aerobic system where the county allows it. Ellis and Kaufman limit or bar both options.
Sludge transporters (30 TAC Chapter 312)
Hauling domestic septage, grease trap waste or other sludge wastes requires a TCEQ sludge transporter registration. Registrations expire every other year on August 31. Each truck must show the company name, a local phone number and the five-digit TCEQ registration number, plus a TCEQ vehicle sticker. Every load needs a trip ticket, with copies for the customer.
Frequently asked questions
Do I need a permit to replace a septic tank?
Yes. TCEQ says a permit is required when a tank must be replaced or a drainfield repaired or replaced, and the disposal area must then meet current standards. A repair that can be done without removing the tank counts as an emergency repair.
I have 10 acres. Do I still need a permit?
Under state rules you may not, if every condition of the 10-acre rule is met. In Ellis and Kaufman counties you do. Check your county first.
Where do I complain about a failing system or a contractor?
File with your local permitting authority, which must investigate within 30 days. If it doesn't, TCEQ says to go to the authority's supervisors, such as the county judge or commissioners, and then to the TCEQ regional office.
Need a permitted installation or repair? Request service to reach licensed professionals, or see septic installation, septic repair and aerobic maintenance.
Related guides
Sources
- Getting a Permit for an OSSF (TCEQ)
- Choosing a Septic System (TCEQ)
- Basics for Septic Systems (TCEQ)
- Occupational Licenses: On-Site Sewage Facilities (TCEQ)
- Maintenance of On-Site Sewage Facilities (TCEQ)
- Filing a Complaint Related to an OSSF (TCEQ)
- On-Site Sewage Facility Rules Compilation, RG-472 (TCEQ)
- Rule Project 2021-030-285-CE, adopted Chapter 285 amendments (TCEQ)
- 30 TAC Chapter 285, On-Site Sewage Facilities (Texas Secretary of State)
- 30 TAC Chapter 312, Sludge Use, Disposal, and Transportation (Texas Secretary of State)
- Sludge Transporter Registration (TCEQ)
- Transporting Sludge Wastes in Texas, RG-309 (TCEQ)
- Order Regulating On-Site Sewage Facilities, approved April 2024 (Ellis County)
- On-Site Sewage Facilities Order, approved February 2022 (Kaufman County)