Aerobic septic maintenance requirements in Texas

If your home has an aerobic treatment unit and spray field, Texas law expects someone to inspect it, keep the chlorinator stocked and, in most cases, report to your county. Here is who that someone can be and what the rules actually say.

By The Septic Connection · Updated November 21, 2026

Reviewer: pending. This guide will be reviewed by a licensed installer before we name one.

Which systems these rules cover

Texas regulates septic systems, called on-site sewage facilities (OSSFs), under 30 Texas Administrative Code Chapter 285. The maintenance rule is §285.7. It applies to the systems listed in §285.91(12) as needing maintenance contracts. TCEQ describes these as systems using secondary treatment (such as aerobic treatment units), non-standard treatment, drip irrigation and surface application, which includes spray fields.

The first two years: the initial service policy

Every new system in this group starts with an initial two-year service policy. Under §285.7(c):

  • It runs two years from the date the system is first used. For a new house, that is the date the builder sells it.
  • A copy of the signed policy goes to the permitting authority before the system is approved for use.
  • The work must be done by a licensed maintenance provider, or a registered maintenance technician working under one.
  • If the house sells before the two years are up, the policy carries over to the new owner.

After two years: contract or self-maintenance

At the end of the initial policy, §285.7(d)(4) says the owner of a single-family home must either maintain the system personally or get a new maintenance contract. Self-maintenance is not allowed for commercial, speculative residential or multifamily property.

TCEQ adds an important caveat: some local permitting authorities have stricter rules, including training requirements or outright bans on homeowner maintenance. Your county's rule controls, so check it before you let a contract lapse (see the county section below).

What a maintenance contract must include

Under §285.7(d)(1), the contract must at a minimum:

  1. List the items covered.
  2. Set how quickly the provider will respond to your complaint.
  3. Name the maintenance provider responsible for the contract.
  4. State how often routine maintenance, testing and reporting happen.
  5. Say who is responsible for the disinfection unit (usually the chlorinator).
  6. Give the provider's physical business address and phone number.

Deadlines. The signed contract goes to the permitting authority 30 days before the initial policy expires, and each renewal at least 30 days before the current one ends. If a provider drops you, it must give you, the permitting authority and the manufacturer 30 days' written notice, and you then have 30 days after termination to file a new contract unless you maintain the system yourself.

TCEQ notes that a maintenance provider is an individual person, not a company. TCEQ no longer registers maintenance companies. You can look up a provider's license in TCEQ's licensing search.

What the provider does on each visit

  • Tags the system. At the start of the contract, the provider puts a weather-resistant tag on the motor cover, control panel or breaker box with the provider's name, phone and contract start date, and marks it at every visit, including complaint calls (§285.7(e)(2)).
  • Inspects every component. TCEQ says the provider inspects all components at each visit, and the owner must repair any component that isn't working properly.
  • Tests and reports. Reports go to the permitting authority and to you at least every four months, according to TCEQ, and within 14 days after testing (§285.7(e)(1)). With electronic monitoring that alerts the provider to failures and tracks disinfection, testing can drop to twice a year (§285.7(e)(3)).

AgriLife notes that a basic monitoring contract meets the state minimum but leaves more work to you, so check what the base price includes.

If you maintain it yourself

Owners of single-family homes who maintain their own systems are not subject to the testing and reporting requirements in §285.7(e)(4). The manufacturer must make replacement parts available to you (§285.7(f)). But the job is real work. AgriLife's publication on living with an aerobic unit says self-maintainers need to:

  • inspect at set intervals, usually once every four months
  • wear rubber gloves and eye protection during inspection and testing
  • keep vaccinations current, including tetanus and hepatitis B
  • own test equipment such as a chlorine test kit and a sludge-measuring probe
  • keep records and know which tasks to leave to professionals

AgriLife offers an online Homeowner Maintenance of Aerobic Treatment Units course. In its words, "For Texas counties that have approved this course, it will allow homeowners to maintain their own Aerobic Treatment Unit." Ask your county whether it qualifies.

There is a statutory backstop. The Texas Health and Safety Code §366.0515(g), as reproduced in TCEQ's rules compilation (RG-472), says that in a county with at least 40,000 people, a self-maintaining homeowner found in violation has 10 days to fix it or sign a maintenance contract. A second violation within three years means a contract is required, and a penalty of up to $100 can apply.

Chlorine: the rule people break most

  • TCEQ says to use calcium hypochlorite tablets certified by EPA for wastewater disinfection.
  • Never use swimming pool tablets. TCEQ and AgriLife both warn that pool tablets are usually trichloroisocyanuric acid. They aren't approved for wastewater, release chlorine too slowly, and can form explosive nitrogen chloride. AgriLife adds: never mix the two kinds of tablet.
  • AgriLife recommends checking the chlorinator weekly and wearing gloves with tablets. Don't store them in the house, a garage or near metal tools.
  • If you have a maintenance contract, AgriLife notes that it will probably make you, the homeowner, responsible for adding tablets.

AgriLife's tablet chlorination fact sheet says Texas requires sprayed effluent to contain at least 0.1 milligram of chlorine per liter, or no more than 200 fecal coliform bacteria per 100 milliliters.

County rules in the Dallas–Fort Worth ring

Your permitting authority is usually the county, acting as TCEQ's authorized agent, unless you are inside a city that runs its own program. TCEQ's OARS lookup finds yours. What we found in county documents:

CountyWhat its documents say
EllisAerobic permit applications must include a two-year service contract. Questions go to the Department of Development, 972-825-5200.
JohnsonCheck with the county's OSSF permitting office about local contract and self-maintenance rules.
KaufmanRequires a maintenance contract on all aerobic systems, usually annual, filed with Development Services 30 days before expiration. Oak Ridge and Terrell residents contact their city.
ParkerThe county's recorded affidavit says that after two years the owner must get a contract within 30 days or maintain the system personally.
HuntThe application form answers "Yes" to needing a contract at all times, while the recorded affidavit allows personal maintenance "with the proper training" under the Hunt County OSSF order. Confirm with the Health Department, 903-408-4140.
RockwallLists a separate permit for sprinkler modifications. Ask the Environmental Health Coordinator, 972-204-7602, about maintenance rules.

These are excerpts, not full county orders. Confirm with your county before dropping a contract.

Frequently asked questions

Can I legally service my own aerobic system in Texas?

State rules allow it for single-family homes after the initial two-year policy, but counties can require training or prohibit it. Kaufman County requires contracts on all aerobic systems.

Can I change my spray heads or move them?

AgriLife says to replace broken spray heads with the same type and not move them. Rockwall County lists a permit for sprinkler modifications, which tells you this is regulated work. TCEQ rules require a permit to alter a system (30 TAC §285.3), and anyone paid to alter or repair one must be licensed by TCEQ.

Can the county inspect my system?

Yes. Under §285.7(g), an authorized agent or TCEQ may inspect an aerobic system at any time.

Find a licensed provider

Compare aerobic maintenance providers in your county, or request service and we will connect you with licensed providers who cover your area. For more rules, see Texas septic regulations and permits and how to check a septic company license.

Related guides

Report a correction

Find a septic provider in your county

One short form. Free, no obligation. A septic provider in your county gets in touch.

Request service
Request service