Burleson Septic Cleaning
Burleson, TX
- Septic pumping
- Aerobic maintenance contracts
- Inspections for home sales
- Septic repair
- Installation and permits
We show each company's state license status. Checks are in progress.
16 septic providers serving Johnson County, with each one's TCEQ license status.
16 companies
Burleson, TX
Scurry, TX
State license
License check pending
Joshua, TX
Waxahachie, TX
Allen, TX
State license
License check pending
Burleson, TX
Cleburne, TX
Alvarado, TX
Aledo, TX
Cleburne, TX
Springtown, TX
State license
License check pending
Cleburne, TX
State license
License check pending
The 2020 Census counted 65,625 housing units in Johnson County, 29,203 of them rural, a rough proxy for septic use rather than a count. Johnson County authorized 868 new on-site systems in 2025, according to TCEQ, more than any other county on our list except Parker. Cleburne and Alvarado publish municipal wastewater service, while Cleburne, Burleson and Joshua each handle OSSF permits inside their own city limits.
NRCS soil data for Johnson County lists Crosstell, Heiden, Bolar, Aledo and Sanger as the largest soil components. Heiden is a clay with very high shrink-swell, and Crosstell layers reach about 51% clay in the NRCS data. NRCS rates about 80% of the county's acreage "very limited" for septic tank absorption fields. Texas A&M AgriLife notes that clay soils only accept non-standard drain fields, so soil borings decide the design.
TCEQ's 2025 report shows 824 of Johnson County's 868 new systems used surface irrigation, which state rules pair with secondary treatment such as an aerobic unit. State rules then require an initial two-year service policy and a licensed maintenance provider visit at least every four months. The county's 2018 order adds stricter reporting for non-single-family secondary systems: every four months up to 500 gallons per day and monthly above that, and a maintenance contract for all commercial systems.
Johnson County Development Services permits OSSFs in the unincorporated county; Cleburne, Burleson, Joshua and Fort Worth run their own programs inside city limits. The county's 2018 order requires a permit and inspection regardless of tract size, at least one acre per new lot on public water and two acres on a private well, site evaluations by a Professional Engineer or Professional Sanitarian holding a site evaluator license, and a licensed installer, who must be present at the inspection before final cover.
One short form. Free, no obligation. A septic provider in your county gets in touch.