Johnson County septic permit guide

Johnson County Development Services permits septic systems in the unincorporated county under a 2018 order. Cleburne, Burleson and Joshua run their own programs.

By The Septic Connection · Updated November 21, 2026

Reviewer: pending. This guide will be reviewed by a licensed installer before we name one.

Who issues septic permits in Johnson County

Johnson County is a TCEQ authorized agent for on-site sewage facilities (OSSFs) in the unincorporated county. The county's Development Services department issues OSSF permits as part of that role. The county's rules come from its OSSF order, adopted August 27, 2018 and approved by TCEQ on October 3, 2018. The order names the Johnson County Public Works Department; the county's current site and TCEQ's listing use Development Services.

Johnson County rules that go beyond the state

  • A permit and inspection are required regardless of tract size.
  • New single-family lots need at least one acre on a public water system and two acres on a private well.
  • Site evaluations may be done only by a Professional Engineer or Professional Sanitarian holding a TCEQ Site Evaluator license, and planning materials must come from a Sanitarian or PE.
  • Installation by a licensed installer only; no homeowner installs unless the owner is licensed.
  • Commercial development is limited to 20,000 square feet per acre, and commercial systems need a maintenance contract.

Steps to a permit

  1. Site evaluation by a licensed Site Evaluator or Professional Engineer, with two soil borings or pits (30 TAC §285.30).
  2. Planning materials: the system design and site drawing (30 TAC §285.5).
  3. Application with planning materials, site evaluation and fee; aerobic systems also need an affidavit recorded in the county deed records (30 TAC §285.3(b)).
  4. Authorization to construct, approved or denied within 30 days and valid for one year.
  5. Inspection before the system is covered; the installer gives five working days' notice.
  6. Notice of approval (license to operate), the final part of the permit. Aerobic systems need the signed two-year service policy on file first (30 TAC §285.7).

Under the county order, the site evaluator and designer prepare the planning materials, which are submitted to the county for review and approval before construction. The licensed installer builds the system, and the county inspects it before final cover, with the applicant or installer present. The order also collects an extra $10 per permit for TCEQ.

Permit fee

Johnson County publishes its OSSF fees on its permit fees page, but we could not load that page to confirm the current amounts, so we don't print them here. Ask the Development Services office for the current fee before you apply.

The county website blocks automated access, so these figures were read from the published page listing rather than a full page view. Confirm the amount with the office before you pay.

Aerobic systems and maintenance contracts

Johnson County's order does not add homeowner-maintenance limits for single-family aerobic systems, so state rules apply: an initial two-year service policy, then either a contract with a TCEQ-licensed maintenance provider or homeowner maintenance under 30 TAC §285.7. TCEQ notes that inspections are due at least once every four months under contract. For systems other than single-family homes, the order requires a maintenance contract with reports every four months for flows up to 500 gallons per day and monthly for 501 gallons per day or more.

You can check a maintenance provider's or installer's license in TCEQ's license search.

Office contact

  • Office: Johnson County Development Services
  • Address: 2 N. Mill St., Suite 305, Cleburne, TX 76033
  • Phone: (817) 556-6380
  • Hours: Monday to Friday, 8 a.m. to noon and 1 to 5 p.m., as listed in TCEQ's authorized agent records

What changes inside city limits

Four cities issue OSSF permits inside their own limits, according to TCEQ's authorized agent records: Cleburne (10 N. Robinson St., 817-645-0956), Burleson, Joshua (101 S. Main St., 817-929-0329) and Fort Worth for its Johnson County portion. Burleson's Environmental Services has run the city program directly since June 23, 2025 and publishes its fees: new system $260, repair $100, re-inspection $75 (725 SE John Jones Dr., 817-426-9635). Keene, Alvarado, Godley, Venus and Grandview are not on TCEQ's list, so the county handles permits there. Alvarado and Cleburne publish municipal sewer service; ask your city whether sewer reaches your lot.

Frequently asked questions

Do I need a permit to repair my septic system?

TCEQ says replacing a tank or repairing or replacing a drain field requires a permit. Emergency repairs such as replacing a lid or an inlet or outlet device can start right away, but must be reported to the permitting authority in writing within 72 hours (30 TAC §285.35).