Ellis County's Department of Development permits septic systems in most of the county under an order TCEQ approved in 2024. Several cities run their own programs.

By The Septic Connection · Updated November 21, 2026

Reviewer: pending. This guide will be reviewed by a licensed installer before we name one.

Who issues septic permits in Ellis County

Ellis County is a TCEQ authorized agent, meaning TCEQ has approved the county's own OSSF order and the county issues septic permits instead of TCEQ. The county's TCEQ listing says it serves the entire county except the City of Midlothian and other authorized agents. The county's current rules are the Order Adopting Rules of Ellis County, Texas for On-Site Sewage Facilities, adopted February 6, 2024 and approved by TCEQ on March 28, 2024.

Ellis County rules that go beyond the state

  • A permit, fee and inspection are required regardless of the size of the tract, so the state's 10-acre exemption does not apply here.
  • Minimum lot size is one acre with a public or private water supply and two acres with a private well (or as approved by the Prairielands Groundwater Conservation District), never less than one acre.
  • Planning materials must be prepared by a Registered Professional Sanitarian or Professional Engineer, and site evaluations may be done only by a PE or Sanitarian who holds a TCEQ Site Evaluator license.
  • No homeowner installations unless the owner is a licensed installer.
  • Spray timers must be set to run between 12:00 a.m. and 5:00 a.m.

Steps to a permit

  1. Site evaluation by a licensed Site Evaluator or Professional Engineer, with two soil borings or pits (30 TAC §285.30).
  2. Planning materials: the system design and site drawing (30 TAC §285.5).
  3. Application with planning materials, site evaluation and fee; aerobic systems also need an affidavit recorded in the county deed records (30 TAC §285.3(b)).
  4. Authorization to construct, approved or denied within 30 days and valid for one year.
  5. Inspection before the system is covered; the installer gives five working days' notice.
  6. Notice of approval (license to operate), the final part of the permit. Aerobic systems need the signed two-year service policy on file first (30 TAC §285.7).

Ellis County takes applications online through the MGO Connect portal. Staff accept, return or reject the application; once accepted, an invoice is issued and must be paid within five business days or the application can be rejected. An inspector then reviews it, and the approved permit appears in the portal. Aerobic applications include the design, technical form, soil evaluation, the affidavit filed with the County Clerk and the initial maintenance contract.

Permit fee

The Department of Development Master Fee Schedule (effective October 13, 2026) lists, under septic fees:

ItemFee
Any septic system$600
Alteration, hook-to, re-inspection or repair$175
Septic-related variance or appeal$375
Miscellaneous septic fees$150

Card payments carry a 2.25% fee, and County Clerk filing fees (for the aerobic affidavit) are extra.

Aerobic systems and maintenance contracts

The 2024 order requires a maintenance contract with a TCEQ-licensed provider for systems listed in 30 TAC §285.91(12), which includes aerobic and other secondary treatment. Ellis County allows homeowner maintenance only if the owner is a licensed provider, was trained by an installer, or completed a county-approved basic homeowner course. An owner who fails to submit reports for six consecutive months loses the right to self-maintain. Reports must include the pump tank sludge level and the condition of the spray area.

You can check a maintenance provider's or installer's license in TCEQ's license search.

Office contact

  • Office: Ellis County Department of Development
  • Address: 302 N. Monroe St., 2nd floor, Waxahachie, TX 75165
  • Mailing address: 109 S. Jackson St., Waxahachie, TX 75165
  • Phone: (972) 825-5200
  • Hours: Monday to Friday, 8 a.m. to 4:30 p.m.

What changes inside city limits

These cities issue OSSF permits inside their own limits, according to TCEQ's authorized agent records: Waxahachie (408 S. Rogers St., 469-309-4026), Ennis, Red Oak, Cedar Hill, Grand Prairie and Ovilla. In 2025, Waxahachie authorized 59 new systems and Red Oak 34. Midlothian is excluded from the county program; contact the City of Midlothian before applying there. Ferris, Palmer, Italy and Maypearl are not on TCEQ's authorized agent list, so the county handles permits there. Inside any city, ask first whether sewer service is available.

Frequently asked questions

Do I need a permit to repair my septic system?

TCEQ says replacing a tank or repairing or replacing a drain field requires a permit. Emergency repairs such as replacing a lid or an inlet or outlet device can start right away, but must be reported to the permitting authority in writing within 72 hours (30 TAC §285.35).

Related guides

Report a correction

Find a septic provider in your county

One short form. Free, no obligation. A septic provider in your county gets in touch.

Request service
Request service