Kaufman County septic permit guide
Kaufman County Development Services permits septic systems in the unincorporated county and most city limits. Its order is stricter than the state rules on lot size and aerobic maintenance.
By The Septic Connection · Updated November 21, 2026
Reviewer: pending. This guide will be reviewed by a licensed installer before we name one.
Who issues septic permits in Kaufman County
Kaufman County is a TCEQ authorized agent for on-site sewage facilities (OSSFs). Its order was adopted by Commissioners Court on December 23, 2019 and approved by TCEQ on February 11, 2022. The order covers the unincorporated county plus any city with an interlocal agreement with the county. The county's FAQ says Terrell and Oak Ridge are their own authorized agents and that Development Services handles all other city limits.
Kaufman County rules that go beyond the state
- Every single-family dwelling needs a permit, whatever the acreage.
- Lots in subdivisions on public water platted after January 1, 1988 need at least one acre of usable area; new lots on individual water systems need two acres of usable area.
- Site evaluations and designs may be done only by a registered Professional Engineer or Registered Professional Sanitarian with a current Site Evaluator credential.
- A homeowner may not install a system without the proper TCEQ license; the county FAQ says any OSSF work must be done by a licensed installer.
- Surface spray heads must be purple pop-up heads, set to spray between midnight and 5 a.m.
Steps to a permit
- Site evaluation by a licensed Site Evaluator or Professional Engineer, with two soil borings or pits (30 TAC §285.30).
- Planning materials: the system design and site drawing (30 TAC §285.5).
- Application with planning materials, site evaluation and fee; aerobic systems also need an affidavit recorded in the county deed records (30 TAC §285.3(b)).
- Authorization to construct, approved or denied within 30 days and valid for one year.
- Inspection before the system is covered; the installer gives five working days' notice.
- Notice of approval (license to operate), the final part of the permit. Aerobic systems need the signed two-year service policy on file first (30 TAC §285.7).
Kaufman County's site does not publish a step-by-step sequence. It says a permit is needed before a system goes into operation and that installers must be TCEQ-licensed, and it posts the application on its OSSF permit application page. For aerobic systems, the owner files a notarized Certificate of OSSF Requiring Maintenance with the County Clerk and then emails it to the department.
Permit fee
Fee: contact the office; not published online. The county's OSSF, application, payments and FAQ pages do not list an OSSF permit fee. The county order sets only the $10 TCEQ fee collected on each permit.
Aerobic systems and maintenance contracts
Kaufman County is stricter than the state here. Its order requires every aerobic system to stay under a maintenance contract with a TCEQ-licensed maintenance provider, and homeowner self-maintenance is not allowed. Maintenance inspections are every four months, and the provider must send contracts, renewals and terminations to Development Services within seven days. The FAQ says contracts are usually annual and must be submitted 30 days before the current one expires. Non-residential systems need annual BOD and TSS testing.
You can check a maintenance provider's or installer's license in TCEQ's license search.
Office contact
- Office: Kaufman County Development Services, On-Site Sewage Facilities
- Address: 101 N. Houston St., Kaufman, TX 75142
- Phone: (469) 376-4127
- Email: publicworks@kaufmancounty.net
- Hours: Monday to Friday, 8 a.m. to 4:30 p.m., closed noon to 1 p.m.; drop box by the front door
What changes inside city limits
Unlike some counties, Kaufman County's program reaches inside most city limits, including Forney, Kaufman, Crandall, Kemp and Talty. The exceptions are Terrell, which the county FAQ names as its own authorized agent, and the Town of Oak Ridge, which TCEQ lists as an authorized agent (17 systems authorized in 2025). TCEQ's 2025 report also lists the Tarrant Regional Water District as an authorized agent in part of Kaufman County. If your lot is inside a city, ask the city whether sewer service is available before designing a system; Kemp, for example, operates a city wastewater department.
Frequently asked questions
Do I need a permit to repair my septic system?
TCEQ says replacing a tank or repairing or replacing a drain field requires a permit. Emergency repairs such as replacing a lid or an inlet or outlet device can start right away, but must be reported to the permitting authority in writing within 72 hours (30 TAC §285.35).
Related guides
Sources
- Kaufman County, On-Site Sewage Facilities
- Kaufman County OSSF FAQ
- Kaufman County OSSF order (TCEQ approved 2022)
- Kaufman County, Certificate of OSSF Requiring Maintenance
- Kaufman County payments
- 30 TAC Chapter 285, On-Site Sewage Facilities (Texas Secretary of State)
- RG-472, On-Site Sewage Facility Rules Compilation (TCEQ)
- Types of Systems Installed by Time Period, 2025 (TCEQ)
- Maintenance of On-Site Sewage Facilities (TCEQ)
Ready to find a licensed installer or site evaluator in Kaufman County? Request quotes from verified providers.

