Hunt County septic permit guide
Hunt County's Health Department, Environmental Services, issues septic permits under a county order TCEQ approved in January 2023. The county wants every document turned in at once.
By The Septic Connection · Updated November 21, 2026
Reviewer: pending. This guide will be reviewed by a licensed installer before we name one.
Who issues septic permits in Hunt County
Hunt County is a TCEQ authorized agent under the Hunt County Order, On-Site Sewage Facility No. 620107, adopted December 13, 2022 and approved by TCEQ in January 2023. The order covers all of Hunt County except areas under a city's own OSSF order or ordinance, and it also covers cities with an intergovernmental contract with the county. Anyone inside a city's jurisdiction needs a letter from the city stating that no public or private sewer service can be provided.
Hunt County rules that go beyond the state
- Each OSSF requires a permit before installation regardless of lot size.
- Minimum lot size is one acre, with at least half an acre of usable drainage field marked on new subdivision surveys, and one single-family residence per acre.
- Properties containing any floodplain need a Development Permit before a 911 address or septic permit is issued.
- Systems that require maintenance must register with the county every year.
Steps to a permit
- Site evaluation by a licensed Site Evaluator or Professional Engineer, with two soil borings or pits (30 TAC §285.30).
- Planning materials: the system design and site drawing (30 TAC §285.5).
- Application with planning materials, site evaluation and fee; aerobic systems also need an affidavit recorded in the county deed records (30 TAC §285.3(b)).
- Authorization to construct, approved or denied within 30 days and valid for one year.
- Inspection before the system is covered; the installer gives five working days' notice.
- Notice of approval (license to operate), the final part of the permit. Aerobic systems need the signed two-year service policy on file first (30 TAC §285.7).
The county's checklist, How to obtain Authorization to Construct, says to turn everything in at once before payment is accepted: the application in the owner's full name, a 911 address, a Development Permit, a recorded deed with the County Clerk's filing stamp, a survey plat, metes and bounds, and the original site evaluation, design and technical information sheet. Aerobic systems also need the original affidavit, a maintenance contract signed by owner and installer, and the signed Aerobic Wastewater Treatment Systems Homeowners Information form. The county issues the Authorization to Construct within 30 days if all paperwork is in order.
Permit fee
New Septic Fees for Hunt County as of June 1, 2022:
| Item | Fee |
|---|---|
| All permits, residential | $335.00 |
| All permits, commercial | $500.00 |
| Septic modification | $75.00 |
| Septic certification | $150.00 |
| Aerobic annual registration | $25.00 |
| Reinspection | $75.00 |
| Development permit | $40.00 |
Aerobic systems and maintenance contracts
Hunt County's order requires owners to give the county a maintenance contract for any system using aerobic treatment. A TCEQ-licensed provider must do the maintenance and inspect every four months, and contracts and renewals go to the county within seven days of signing. An owner who wants to maintain their own aerobic system must first complete an approved training course. Non-residential systems need annual BOD and TSS testing. The county application FAQ says an aerobic system must stay under a maintenance contract at all times, so ask the office how that applies before relying on the training-course option.
You can check a maintenance provider's or installer's license in TCEQ's license search.
Office contact
- Office: Hunt County Health Department, Environmental Services
- Address: 2701 Johnson St., Greenville, TX 75401
- Phone: (903) 408-4140
- Email: health@huntcounty.net
- Hours: Monday to Thursday, 8 a.m. to 4 p.m.; Friday, 8 a.m. to 3 p.m.; closed noon to 1 p.m.
What changes inside city limits
TCEQ's 2025 report lists three other authorized agents in Hunt County: the City of Caddo Mills, the City of Royse City for its Hunt County portion, and the Sabine River Authority. Greenville, Commerce, Quinlan and Wolfe City all operate municipal wastewater systems and are not listed as authorized agents, so the county permits OSSFs there, and the county order requires the city's no-sewer letter first. A 2007 TWDB regional sewer study planned sewer service for West Tawakoni; check its current status with the city.
Frequently asked questions
Do I need a permit to repair my septic system?
TCEQ says replacing a tank or repairing or replacing a drain field requires a permit. Emergency repairs such as replacing a lid or an inlet or outlet device can start right away, but must be reported to the permitting authority in writing within 72 hours (30 TAC §285.35).
Related guides
Sources
- Hunt County, Septic
- Hunt County Health Department
- Hunt County Order, On-Site Sewage Facility No. 620107
- New septic fees for Hunt County as of June 1, 2022
- Hunt County checklist, How to obtain Authorization to Construct
- TWDB, Hunt County Regional Sewer Study (2007)
- 30 TAC Chapter 285, On-Site Sewage Facilities (Texas Secretary of State)
- RG-472, On-Site Sewage Facility Rules Compilation (TCEQ)
- Types of Systems Installed by Time Period, 2025 (TCEQ)
- Maintenance of On-Site Sewage Facilities (TCEQ)
Ready to find a licensed installer or site evaluator in Hunt County? Request quotes from verified providers.