Installation and permits in Hunt County, TX

We show each company's state license status. Checks are in progress.

A new septic system in Texas follows a set path under 30 TAC Chapter 285, from site evaluation to a written notice of approval. Your county or city may add stricter rules on top.

Installation and permits in Hunt County

12 companies match

    • Septic pumping
    • Aerobic maintenance contracts
    • Inspections for home sales
    • Septic repair
    • Installation and permits

    Counties served

    • Franklin
    • Hopkins
    • Hunt
    • Rains
    • Titus
    • Wood

    State license

    License check pending

  1. Quality Septic

    Quinlan, TX

    • Septic pumping
    • Aerobic maintenance contracts
    • Inspections for home sales
    • Septic repair
    • Installation and permits

    Counties served

    State license

    License check pending

  2. Septic Solutions

    McKinney, TX

    • Septic pumping
    • Aerobic maintenance contracts
    • Inspections for home sales
    • Septic repair
    • Installation and permits

    Counties served

    State license

    License check pending

  3. Total Septic

    Serves Collin, Dallas, Denton, Fannin, Grayson, Hunt, Rockwall counties

    • Septic pumping
    • Inspections for home sales
    • Septic repair
    • Installation and permits

    Counties served

    State license

    License check pending

Who issues the permit

Texas rule 30 TAC §285.3 says a person must hold a permit and an approved plan to construct, alter, repair, extend or operate an on-site sewage facility (OSSF). TCEQ is the permitting authority unless a local government has an OSSF order, ordinance or resolution approved by TCEQ. Those local governments are called authorized agents. In most of our launch counties the county is the authorized agent, and several cities run their own programs. Where no authorized agent exists, the TCEQ regional office handles permits. Our county pages list the office for each area.

The steps

  1. Site evaluation. Rule 30 TAC §285.30 requires a complete site evaluation by a licensed Site Evaluator or a Professional Engineer on every tract where an OSSF will be installed. The evaluator digs two soil borings or backhoe pits and classifies the soil.
  2. Planning materials. Under 30 TAC §285.5, the owner or installer may prepare planning materials for a standard system, but a Professional Engineer or Professional Sanitarian must prepare them for non-standard systems and certain developments.
  3. Application. The owner or agent submits the application, planning materials, site evaluation and fee. Systems that need continuous maintenance, such as aerobic units, also require a recorded affidavit in the county deed records (30 TAC §285.3(b)).
  4. Authorization to construct. The permitting authority must approve or deny within 30 days. Approval comes as an authorization to construct, valid for one year.
  5. Construction inspection. The installer notifies the permitting authority at least five working days before the system is ready, and the authority inspects before it is covered. A failed inspection is followed by a deficiency letter within seven days, and a reinspection fee may apply.
  6. Notice of approval. Within seven days of passing, the permitting authority issues a written notice of approval. Rule 30 TAC §285.2 defines it as written permission to operate and the final part of the permit. For aerobic systems, the signed initial two-year service policy must be on file first.

Lot size and exemptions

State rule sets minimum lot sizes for new subdivisions using OSSFs: half an acre when served by a public water system and one acre when not (30 TAC §285.4). State rule also exempts a single-family home on ten acres or more from permits if all parts of the system are at least 100 feet from the property line and the system causes no nuisance. Several of our counties override both: Ellis, Johnson, Kaufman and Parker counties require a permit regardless of tract size and set larger minimum lots. Check the county page before you buy land.

Licenses to check

  • Site Evaluator or Professional Engineer for the site evaluation.
  • Installer I for standard systems, Installer II for all system types, including aerobic.
  • Maintenance Provider for the aerobic service policy.

Look them up in TCEQ's license search.

What to ask an installer

  1. Who will do the site evaluation and design, and what licenses do they hold?
  2. What system type does the soil call for, and why?
  3. Does your price include the permit fee, the affidavit filing and the first two years of aerobic service?
  4. Who schedules the inspection and attends it?

Frequently asked questions

Can I install my own septic system?

The state rule allows owners to prepare planning materials for standard systems, but local orders can be stricter. Ellis, Johnson and Kaufman counties do not allow homeowner installation unless the owner holds a TCEQ installer license.

Why do so many new systems here use spray irrigation?

Much of this region has heavy clay soil. AgriLife notes that a standard drain field cannot be used in clay soil, and TCEQ's 2025 report of systems authorized by each authorized agent shows surface irrigation made up most new systems in all six of our launch counties. Under 30 TAC Chapter 285, surface application requires secondary treatment and a maintenance contract.