Skip to content

Aerobic maintenance contracts in Ellis County, TX

We show each company's state license status. Checks are in progress.

Aerobic treatment units have air pumps, chlorinators and controls that need routine service. Texas rules set who may service them, how often, and when a maintenance contract is required.

Aerobic maintenance contracts in Ellis County

10 companies match

    • Septic pumping
    • Aerobic maintenance contracts
    • Inspections for home sales
    • Septic repair
    • Installation and permits

    Counties served

    State license

    License check pending

    • Septic pumping
    • Aerobic maintenance contracts
    • Inspections for home sales
    • Septic repair
    • Installation and permits

    Counties served

    State license

    License check pending

    • Septic pumping
    • Aerobic maintenance contracts
    • Inspections for home sales
    • Septic repair
    • Installation and permits

    Counties served

    State license

    License check pending

  1. L & D Septic Services

    Serves Dallas, Ellis counties

    • Septic pumping
    • Aerobic maintenance contracts
    • Inspections for home sales
    • Installation and permits

    Counties served

    State license

    License check pending

What aerobic maintenance covers

An aerobic treatment unit adds air to the wastewater so bacteria can break it down further before it is disinfected and sprayed or dispersed. State rule 30 TAC Chapter 285 calls these secondary treatment systems. Because they rely on mechanical and electrical parts, the rule's Table XII marks every secondary treatment system as requiring a maintenance contract or affidavit.

TCEQ's maintenance page says each visit must inspect the system's components and note whether every component is working. The contract must also say who is responsible for the disinfection unit, according to 30 TAC §285.7.

The license your provider must hold

Aerobic maintenance in Texas requires a TCEQ Maintenance Provider license. TCEQ describes this license as authorizing service or maintenance of on-site systems that use aerobic treatment. A Maintenance Technician registration lets a person do the work only under the direct supervision of a licensed maintenance provider, and under 30 TAC §285.7 the provider signs every maintenance report and is responsible for the technician's work.

You can look up an individual license with TCEQ's license search.

How the rules work

  • Initial two-year service policy. Every new aerobic system starts with a two-year service policy. For a new home it runs from the date of sale by the builder. A signed copy must go to the permitting authority before the system is approved for use (30 TAC §285.7(c)).
  • Visits every four months. TCEQ says the licensed provider must send a report to the permitting authority and owner at least once every four months, within 14 days of the visit. With an electronic monitor, TCEQ says the frequency may drop to once every six months.
  • A tag on the unit. The provider installs a weather-resistant tag naming the company, its phone number and contract start date, marked at each visit (30 TAC §285.7(e)).
  • Renewals. After the first two years, the owner sends a new signed contract to the permitting authority at least 30 days before the current one expires. If either side cancels, the provider must give 30 days' written notice, and the owner has 30 days after termination to file a new contract.
  • Maintaining it yourself. After the two-year policy, the owner of a single-family home may maintain the system personally. This option is not available for commercial, speculative residential or multifamily property. TCEQ notes that some permitting authorities require homeowner training or prohibit homeowner maintenance, so check your county or city first.
  • Affidavit. Before a permit is issued for a system that needs continuous maintenance, the owner records an affidavit in the county deed records (30 TAC §285.3(b)(3)).

What to ask a maintenance provider

  1. What is your TCEQ Maintenance Provider license number, and who will actually visit?
  2. Is the provider certified for my brand of aerobic unit?
  3. What does the contract cover, and how fast do you respond to a complaint call?
  4. Who supplies chlorine tablets, and are they included?
  5. Will you file the reports with my permitting authority and copy me?

Frequently asked questions

Does an aerobic system still need pumping?

Yes, eventually. TCEQ says it depends on the depth of sludge and the manufacturer's recommendations, which is why the provider checks sludge levels on visits.

I bought a house with an aerobic system. What now?

If the home is sold within the initial two-year policy, its terms carry to the new owner. TCEQ also tells buyers to notify the local permitting authority that they are the new owner.

Can the county inspect my aerobic system?

Yes. Rule 30 TAC §285.7(g) says an authorized agent or TCEQ may inspect an aerobic system at any time.

Find a septic provider in your county

One short form. Free, no obligation. A septic provider in your county gets in touch.

Request service
Request service